Observations
-
20 July 2025
Wagg Creek, St Mary' branch by Paul Lhotka
Carolynne and I monitored here Aug 20, 2022, but data was not recorded in WR. Tim Rodgers did 6PPD-Q sediment sampling here with me Aug. 6, 2024. Today ALS Global took 6PPD and 6PPD-Q water samples here and I recorded WR data. Water is clear turbidity <14 NTU
-
-
20 July 2025
MIS-W-01 by Paul Lhotka
-
-
-
20 July 2025
WAG-M-03 by Paul Lhotka
Crayfish and stickleback observed. Turbidity < 14 NTU. ALS Global sampling 6PPD and Q
-
20 July 2025
WAG-E-06a by Paul Lhotka
roots have grown back making bucket flow impossible. Need to cut them out again to get bucket in position; Turbidity <14
-
20 July 2025
15th Street Storm drain - WAG-E-03 High Priority by Paul Lhotka
bucket 9L/ 2.09/sec and 9 L/2.66 sec <14 NTU
-
20 July 2025
WAG-M-02 by Carolynne Robertson
<14 turbidity ALS sampling 6PPP and 6PPD-Q last stop for Josh and Carolynne; the rest of us (4) continue
-
-
20 July 2025
MIS-M-01 by Carolynne Robertson
-
20 July 2025
Keith Rd Storm Drain - WAG-E-01 High Priority by Carolynne Robertson
<14 turbidity ALS sampling 6PPP and 6PPD-Q Bucket flow 10L 20.34/sec; 12 L 24.18/sec
-
20 July 2025
WAG-M-01 by Carolynne Robertson
<14 turbidity ALS sampling 6PPP and 6PPD-Q. Present CR, PGL, Josh Baker, Louis Wagner, Marianne from ALS Global and Louis' wife
-
9 July 2025
MIS-E-01 by Paul Lhotka
Turbidity < 14 (dark, hard to see); pH actually looks <6.4. BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data, but lab water are the tailout of combined MIS-E+W-01
-
9 July 2025
MIS-W-01 by Paul Lhotka
BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data Turbidity <14 (hard to see as getting dark)
-
9 July 2025
WAG-W-03 by Paul Lhotka
BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data
-
9 July 2025
WAG-E-06a by Paul Lhotka
BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data
-
9 July 2025
15th Street Storm drain - WAG-E-03 High Priority by Paul Lhotka
lots of foam, but not as much as July 2024 first flush
-
9 July 2025
Keith Rd Storm Drain - WAG-E-01 High Priority by Paul Lhotka
BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data
-
9 July 2025
WAG-M-01 by Paul Lhotka
BV lab water and ALS Global 6PPD and 6PPD-Q samples collected simultaneously with WR data. Sampling six sites heading upstream roughly two hours after light rain started.