Dataset

Wagg Creek Water Quality Monitoring Group

Dataset summary

Observations

  • 20 April 2025

    WAG-M-01 by PAULA PAPPAJOHN

    Rain stopped ~20 min before sampling and sampling of WAG-E-03, WAG-E-01 and MIS-E+W-01 could not be completed. This mainstem site was sampled as a reference for WAG-W-03 and WAG-E-06a. Tier 1 and Tier 2 lab samples for BV taken.

  • 20 April 2025

    WAG-E-06a by PAULA PAPPAJOHN

    Tier 1 and Tier 2 lab samples taken for BV. Rain was stopping, runoff still trickling into storm drain on chesterfield Ave. Turbidity taken at bottom of storm outfall. High water turbulence may have resulted in <14 NTU reading, but some turbidity was observed in the plunge pool.

  • 20 April 2025

    WAG-W-03 by PAULA PAPPAJOHN

    Tier 1 and Tier 2 lab samples taken for BV.

  • 5 April 2025

    WAG-M-01 by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously. Many small fry seen - likely chum salmon

  • 5 April 2025

    Keith Rd Storm Drain - WAG-E-01 High Priority by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously. Salmon fry observed in pool just upstream where data logger is bolted to rock

  • 5 April 2025

    15th Street Storm drain - WAG-E-03 High Priority by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously.

  • 5 April 2025

    WAG-E-06a by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously.

  • 5 April 2025

    WAG-W-03 by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously.

  • 5 April 2025

    MIS-E-01 by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously, but lab water is combined MIS-E+W-01

  • 5 April 2025

    MIS-W-01 by Marissa Hoftiezer

    Turbidity <14. Lab water sample for BV collected simultaneously, but lab water is combined MIS-E+W-01

  • 31 January 2025

    MIS-W-01 by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    MIS-E-01 by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    WAG-W-03 by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    WAG-E-06a by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    15th Street Storm drain - WAG-E-03 High Priority by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    Keith Rd Storm Drain - WAG-E-01 High Priority by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 31 January 2025

    WAG-M-01 by Marissa Hoftiezer

    Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

  • 29 January 2025

    Keith Rd Storm Drain - WAG-E-01 High Priority by Paul Lhotka

    Turbidity <14