Observations
-
19 March 2025
Chestnut Field Wetland (Bottom of the Wetland) by Lula Wattam
-
19 March 2025
Chestnut Farm Allotments Downstream (Dagenham Brook) by Lula Wattam
-
-
17 March 2025
Lake Aquitaine Park by Iyah Z.
Most of pond still frozen, debris in the pond (branches, trash). Squirrels in the area
-
15 March 2025
Osprey Marsh, Johnny Bower Park by Iyah Z.
Squirrels, beavers, wood and debris in the water likely due to rain, construction in the area
-
15 March 2025
Loon Lake West Shore by Mike Grinnell
Added measurement ORP equals 233 mV. Interestingly the Chloride reading is holding constant at 10 mg/l. There is no input of chloride since early March and with no outflow from the lake yet, therefore is no decline in chloride. Water levels are very slowly increasing but appear to be having no dilution effect.
-
15 March 2025
Chestnut Farm Allotments Midstream (Dagenham Brook) by Lula Wattam
-
15 March 2025
Chestnut Farm Allotments Midstream (Dagenham Brook) by Lula Wattam
-
15 March 2025
Chestnut Farm Allotments Upstream (Dagenham Brook) by Lula Wattam
-
15 March 2025
Chestnut Farm Allotments Upstream (Dagenham Brook) by Lula Wattam
-
14 March 2025
Chestnuts Field (Before Wetland Outfall) by Lula Wattam
-
14 March 2025
Chestnuts Field (After Wetland Outfall) by Lula Wattam
-
14 March 2025
Chestnut Field Wetland (Bottom of the Wetland) by Lula Wattam
-
7 March 2025
South Retention Pond HPNC 2 by High Park Nature Centre
-
7 March 2025
Yeading Walk by Angelique Soon
Sweage fungus observed coating stones and on the tips of aquatic vegetation. Black algae (non furry) also observed This is the worst I have seen it for a long time. some oil also observed floating on surface 110 gammarus caught, dead invertebrate in sample
-
1 March 2025
Loon Lake West Shore by Mike Grinnell
Tap location. This is part of the chloride monitoring for the MTO project to discover if chloride levels from road salting can be reduced by the introduction of DLA in this area near a lake bordered by a highway. The chloride levels have dropped from 14 to 10 mg/l since the introduction of DLA to prewet NaCl. So far, the experiment/project appears successful.
-
28 February 2025
Pioneer Park Canoe launch by Mike Watson
-
27 February 2025
Downstream of the bridge by Jenny Hill
Chloride estimated from extrapolation of manufacturers calibration curve (raw reading = 8.2)
-
26 February 2025
Eslava Drive by Regan Smart
-
25 February 2025
GAlena River by Madelynn Wilharm