Dataset

Ravensbourne Catchment Improvement Group's Water Quality Working Group

Dataset by Thames21

Dataset summary

Observations

  • 9 May 2024

    Kyd Brook C.S.O by Kirsty Blackman

    There is a known combined sewer overflow (C.S.O) a little further upstream from this testing site. There is an EDM ( event duration monitor) at this C.S.O operated by Thames Water, which showed that the C.S.O. last discharged on the 6th May 2024 for 30 mins.

  • 24 April 2024

    Kyd Brook S.W.O downstream by Kirsty Blackman

    There is a surface water overflow at this site that discharges into Kyd Brook. There is detergent coming from the S.W.O This has been reported to Thames Water ref 00619975

  • 24 April 2024

    Beck River Kelsey Park by Malvin Mitchell

    fallen or felled trees create a baffle or minor weir.

  • 23 April 2024

    Kyd Brook C.S.O by Kirsty Blackman

    According to the edm the combined sewer last overflowed on 15/4/2024 for 30 mins.

  • 15 April 2024

    Kyd Brook Hawkswood Estate by Kirsty Blackman

    Riverfly monitoring score = 4. Gammarus= 79 Olives = 16 Annelid = 1 Leeches= 2 Moderate flow, running clear.

  • 3 April 2024

    Kyd Brook S.W.O downstream by Kirsty Blackman

  • 23 March 2024

    Glassmill Pond inlet by Joel Wigfield

    Normal River Flow