Dataset

Lea Guardians

Dataset by Thames21

Dataset summary

Observations

  • 3 February 2024

    The White House Bridge (Old River Lea) by Philly Nicholls

    Air temp around 12°, water much lower and much slower, still turbid

  • 29 January 2024

    Grovelands Park Lake Entry by Peter Leedham

    Both readings flashing ie higher than recorded

  • 29 January 2024

    Grovelands Park Lake Outfall by cafe and dam by Peter Leedham

  • 25 January 2024

    Eversley Crescent Outfall (Upstream) by Philly Nicholls

    There has been a lot of rain and the flow is quite fast even though it hasn't rained for a day or two.

  • 25 January 2024

    Eversley Crescent Outfall (Downstream) by Philly Nicholls

  • 21 January 2024

    Grovelands Park Lake Outfall by cafe and dam by Philly Nicholls

  • 21 January 2024

    Grovelands Park Lake Entry by Philly Nicholls

    Both Ammonia and Phosphate meters flashing

  • 14 January 2024

    Grovelands Park Lake Outfall by cafe and dam by Philly Nicholls

  • 14 January 2024

    Grovelands Park Lake Entry by Philly Nicholls

    Ammonia Meter flashing

  • 7 January 2024

    Grovelands Park Lake Outfall by cafe and dam by Philly Nicholls

  • 6 January 2024

    The White House Bridge (Old River Lea) by Philly Nicholls

    Very heavy rain for several days, river extremely high (the canal had broken its banks just downstream earlier creating several feet of flooding in Dace and Wick Roads), water very brown and turbid, very fast.