Location

UPPER STOQUA CK Site ID - SC-01

Muskrat Lake Watershed

Muskrat Lake Watershed in Ontario

Dataset summary

UPPER STOQUA CK Site ID - SC-01 has data for ph, hardness, alkalinity, conductivity, turbidity, water_temperature, and phosphates from 27 November 2017 to 27 November 2017.

45.660232, -76.986906

Summary of quantitative results

Guidelines for exceedances are based on: Canada
  • Chemistry tests

    • Alkalinity

      ppm

      Taylor teststrips (alkalinity)

      180.0

      Latest

      180.0

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • Phosphates

      ppm

      Unspecified equipment (phosphates)

      3.0

      Latest

      3.0

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • Conductivity

      μS/cm

      Water Rangers pen-type meter (conductivity)

      483.0

      Latest

      483.0

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • pH

      Taylor teststrips (pH)

      7.8

      Latest

      7.8

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • Water temperature

      °C

      Water Rangers pen-type meter (temperature)

      4.9

      Latest

      4.9

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • Hardness

      ppm

      Taylor teststrips (hardness)

      450.0

      Latest

      450.0

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

    • Turbidity

      NTU

      Turbidity tube (45 cm)

      30.0

      Latest

      30.0

      Average

      Not enough data for trend yet

      Trendlines will appear once three sampling dates are entered

View observation list ›

Location description
UPPER STOQUA CK ABOVE CONTROLLED TILE DRAIN INSTALLATION